Office Phone Relocation Project for GFI
Global Financial Integrity is relocating to a new office space in Washington, DC. We are assisting by installing network, phone and fax cabling into the new office. Additionally, we are going to relocate the phone system. Verizon will bring the service (in the form of a 25-pair cable) into the building and into the office. But we will need to physically move the phone equipment and reconnect it.
The three major challenges are:
- Disconnecting and moving the equipment
- Mounting and reconnecting the equipment in the new office
- Working with Verizon to make sure that dial tones are reaching every phone
Here are some pictures of the phone system before the move.