Stu Kushner began his career at Boeing Commercial Aircraft and then on to Hexcel and Case/Rixon where he specialized in CAD/CAM (computer design and robotics). In 1986, he started Progressive Office. The earliest years were about networking small businesses and providing IT support. But since 2008, the company has concentrated exclusively on providing office network cabling solutions.

voip-phone, Network Cabling, Data Cabling

Constraints of Network Design

17 Jul 2018

voip-phone, Network Cabling, Data CablingThe constraints of network design are existing factors that cannot be altered, often impacting architecture and functional requirements. These constraints can have a significant effect on network design and must be taken into account. Below are the most familiar design constraints that must be addressed by a network designer.



Cost


Cost is certainly a limiting factor that must always be considered during the design process.



Experienced & Expensive Staff


In order to quickly adapt to new technology, a company may decide to hire technical employees who are expert in the new technologies, but cost more in salary. The greater operational costs for their expertise may exceed the benefits from the decreased TCO (total cost of ownership) derived from the latest technology.



Expertise of Staff


It may be the case that the most efficient, cost-saving design with state-of-the-art technology was presented by the network design team. However, the current staff may not have the experience or know-how to implement this new technology.



Infrastructure Equipment


In cases where an organization has not planned how to replace legacy network devices, the situation can lead to severe limitations on network design. This is quite apparent when new protocols and features cannot be supported.



Location


This is a difficult kind of constraint because location involves limitations that have an indirect effect on design. To illustrate, a rural site might be in a region where fiber infrastructure is not present and wireless is the only connectivity.



Staff Training


Due to the lack of experience of technical staff in a newer technology, issues may take longer to detect and repair until they are adequately trained. This will lead to longer downtimes that render a data center nonfunctional, resulting in business losses.



Time


When choosing an architecture or technology, time becomes a constraint when the time frame plays a part in remaining on schedule for the completion of the project.



Progressive Office Cabling


Founded in 1986, Progressive Office’s success has been a direct result of years of commitment to seeking solutions on behalf of our clients in the Washington, D.C. and New York City areas. Efficiently working together, Progressive teams get cabling installed and operating as fast as possible while minimizing disruption and downtime. Call our toll free number (800) 614-4560 today.

Data Cabling ,Cat5e ,Cat6/6a ,Cabling ,Structured Cabling

Creating the Requirements of Network Design

5 Jul 2018

Data Cabling ,Cat5e ,Cat6/6a ,Cabling ,Structured CablingVarious requirements that are skillfully combined during the implementation phase can result in a desired network design that helps attain a company’s business goals. Below is a classification of requirements for an organization. Some may be directly provided by the network design team while others may be determined from the goals or requirements of the company.



Business Goals



  • Decreasing operational costs

  • Expanding business via additional remote sites

  • Increasing staff productivity


Business Requirements



  • Decrease expenses for the maintenance of multiple voice & data networks

  • Provide support for expanding business via additional remote sites

  • Raise staff productivity by improving internal communications via mobile and video devices, while safeguarding company security


Functional Requirements



  • Ability to introduce and support new remote sites to the network without redesign

  • Infrastructure supporting data, video, voice, and wireless in a unified manner

  • Isolation of guest and employee wired and wireless traffic to comply with standard company security policy


Application Requirements


When an organization plans to add video and VoIP capability to their network, particular application requirements must be met. In such instances, the network design must be capable of providing sufficient network availability, efficiency, and performance for these two new features to support business goals.



Technical Requirements


In order to attain the above example’s functional and application requirements in consideration of the company’s business goals, the network design must have the following features:


High Availability – Raise the level of high availability in order to support traffic crucial to business, such as data and voice.


Quality of Service (QoS) – User experience can be greatly improved through the introduction of QoS in order to attain excellent voice and video services.


Scalability – Implement scalable network (WAN) design for supporting growth of business projected for the coming 12 months.


Security – Network security must be optimized when new features such as voice and Wi-Fi security are added.


Traffic Isolation – Provide traffic isolation to meet information security requirements.



Progressive Office Cabling


Founded in 1986, Progressive Office’s success has been a direct result of years of commitment to seeking solutions on behalf of our clients in the Washington, D.C. and New York City areas. Efficiently working together, Progressive teams get cabling installed and operating as fast as possible while minimizing disruption and downtime. Call our toll free number (800) 614-4560 today.

Office Cabling Network Cabling

Technical & Application Requirements of Network Design – Part 2

30 Jun 2018

Office Cabling Network CablingAs discussed in Part 1, contemporary network design requires meeting the technical and application requirements of ever expanding and evolving IT and business demands.


Part 2 will continue discussing Application Requirements.



Importance of User Expectation


Networks or IT technologies that are unable to achieve a satisfactory level user expectation or QoE (quality of experience) will be considered to have failed meeting an important business goal. As a result, they will be considered a cost, rather than tools that allow a business to succeed.


A network’s design must take into account how a satisfactory level of user experience will be attained. From the point of view of a user, QoE when utilizing services and applications will determine their level of satisfaction.


The deployment of services and applications before taking into account their features and network requirements will result in a failure to achieve business goals.


To illustrate, a financial services company that wants to provide a video communication application to their customer service representatives, but fails to secure enough bandwidth, will likely frustrate their reps and displease their customers when calls are dropped or interrupted because of excessive latency. Thus, their corporate goal of differentiating themselves from their competitors will be a failure until they meet the network requirements of the application.



Evaluation of Application Requirements


Network designers should keep in mind their responses to the key questions below for the evaluation of application requirements:

  • What are the application’s features and characteristics?

  • What is the length of time the application needs to reset its session or state after losing connectivity?

  • What is the amount of network traffic that is required by the application?

  • How important is the application to the organization and what is the service level it will require to function properly?

  • For its compliance with industry regulations and company security polices, will the application have separation requirements?


Progressive Office Cabling


Founded in 1986, Progressive Office’s success has been a direct result of years of commitment to seeking solutions on behalf of our clients in the Washington, D.C. and New York City areas. Efficiently working together, Progressive teams get cabling installed and operating as fast as possible while minimizing disruption and downtime. Call our toll free number (800) 614-4560 today.

Data Cabling, Installation Washington DC

Planning the Cabling for Your New Location – Part 2

15 Jun 2018

Data Cabling Installation | Office Cabling Washington DCAs discussed in Part 1, moving often overwhelms staff, and cabling for data, power, communications, and security may not be prioritized adequately. Part 2 will discuss Health & Safety, Flexibility, Future Growth, and Structured Cabling. Consult with an experienced and expert cabling company prior to starting your project to get the best results.



Health & Safety


Consideration should be given to the health and safety of both employees and staff when planning the cabling at your new facility. Wiring that provides connections to equipment and telecommunications and power companies should not endanger the welfare of people by blocking emergency exits, ventilation ducts, and cooling systems.


Ensure that regulatory compliance for securing certain types of sensitive or personal data will be met. This will require locating data storage, servers, and equipment processing transactions properly. Their positions should be considered during the mapping process.



Flexibility


Market conditions can become very fluid, and perhaps only a brief time after moving into a new location will an organization have to make changes in its cabling. Well-designed structured cabling will ensure flexibility that allows a company to make additions and revisions in the most efficient and fastest manner possible to reallocate resources.



Future Growth


The cabling of an organization should give allowance for future expansion of its IT infrastructure. The growth of its business may require the company to seek greater bandwidth, increased communication channels, more electrical power, and additional space. Although the future of a business is often very hard to predict, it is still possible to make projections given the current market and its prospects in the coming years.



Structured Cabling


Having your data, communications, and power cabling installed by several different contractors will work against a properly configured cabling system. This haphazard approach may also result in higher management and maintenance costs. Governed by proven industry standards, a structured cabling system will provide a company an integrated IT infrastructure that allows for ease of maintenance, flexibility, and expansion.



Progressive Office Cabling


Founded in 1986, Progressive Office’s success has been a direct result of years of commitment to seeking solutions on behalf of our clients in the Washington, D.C. and New York City areas. Efficiently working together, Progressive teams get cabling installed and operating as fast as possible while minimizing disruption and downtime. Call our toll free number (800) 614-4560 today.

Office Cabling Network Data Cabling

Office Cabling for Performance and Efficiency – Part 2

31 May 2018

Office Cabling Network Data CablingAs discussed in Part 1, office space has become very valuable and costly in many cities. Some companies will need to implement space optimization, and designing their structured cabling network is a good place to start. Part 2 will discuss Cabling System Performance and Densification of Networks.



Cabling System Performance


The TIA 568 standard sets the limit for runs of copper cable to 90 meters (295 feet) from floor distributor to workstations. Exceeding this length will cause greater signal losses or insertion loss and delay limitations due to the Ethernet protocol, which can decrease the performance of the network.


An expansive floor size with a proper number of floor distributors will oftentimes result in cables longer than 90 meters and greater insertion losses. Moreover, short cable runs are affected by crosstalk and return loss.


Due to the increasing implementation of 2.5, 5G, and 10G Ethernet, along with the newest high performance WAP (wireless access points), it is crucial to install a category cable, such as CAT6A, capable of handling higher bandwidth demands in the future.



Densification of Networks


Horizontal distributor optimization inside the equipment room will result in increased floor space and improved network densification. The optimization of floor distributors can improve the usage of LAN Ethernet switches, minimizing intra-building backbone runs. Implementing optimized distributor placement will ease the management of the network and increase reliability.


The use of fiber and copper panels with higher port density should also be considered by network managers. One way to gauge design efficiency is to calculate the number of ports per unit of rack space. This assessment will result in the optimization of rack space, decreasing racks and maximizing floor space.


Using wall-mounted panels for terminating cables and easing their management should also be considered. This will also ensure the prioritization of LAN equipment and fiber panels for rack space. This method suits companies who desire the convergence of building applications and IP networks.



Progressive Office Cabling


Founded in 1986, Progressive Office’s success has been a direct result of years of commitment to seeking solutions on behalf of our clients in the Washington, D.C. and New York City areas. Efficiently working together, Progressive teams get cabling installed and operating as fast as possible while minimizing disruption and downtime. Call our toll free number (800) 614-4560 today.

Data Cabling,Structured Cabling,Washington DC

Is Wired or Wireless Best for Your Business? – Part 2

15 May 2018

Data Cabling,Structured Cabling,Washington DCAs discussed in Part 1, many users no longer think wired Internet connections are necessary because WiFi has become so commonplace in everyday use. However, hard-wired connections do have advantages for businesses that should not be overlooked. Part 2 will discuss Wireless Advantages and Considerations.



Wireless Advantages


Typically, wireless Internet connections will likely be adequate for the majority of tasks at a workplace. Lots of employees like wireless primarily because of its convenience and mobility, thinking the advantages from a hard-wired connection are not worth the trouble of attaching an Ethernet cable. In addition, advancements in WiFi technology are gradually gaining on . Even though an organization may not require Ethernet’s advantages in speed, low-latency, stability, and security, it should reconsider before going completely wireless.



Wireless Considerations


Make sure that the new WiFi equipment that your company buys features the newest 802.11 AC Wave 2 standard. It will be crucial for the future because it can support several users and handle multiple inputs and outputs (MU-MIMO).


Another benefit of 802.11 AC Wave 2 is that it gives WiFi equipment the capability of supporting multiple inbound and outbound streams. Thus, a company’s WiFi will be able to receive and broadcast data at the same time. As a result, audio and video streaming performance is improved.


The 802.11 AC Wave 2 standard will also allow your organization to implement future technological advancements. The latest devices from Apple can support MIMO over 5Ghz bandwidth, and this will eventually become the industry standard in the near future.



Conclusion


Obviously, an office can have both Ethernet and WiFi. Certain types of organizations require a hard-wired network to handle very large files, and they will also need to provide WiFi for guests, conference rooms, and outdoor areas. Always remember that Ethernet will provide better performance than WiFi for companies that need to process a great volume of data. At the same time, businesses should take advantage of advances in WiFi technology.



Progressive Office Cabling


Founded in 1986, Progressive Office’s success has been a direct result of years of commitment to seeking solutions on behalf of our clients in the Washington, D.C. and New York City areas. Efficiently working together, Progressive teams get cabling installed and operating as fast as possible while minimizing disruption and downtime. Call our toll free number (800) 614-4560 today.